King Fuel

Location: Troy, NY
Project Value: < $1MM
Services:

Scope of Work: This project involved the demolition of two structures. The first was a 25,000 sq ft maintenance and service building; the second was a four story boiler house that contained (4) three story boilers. ERSI utilized controlled demolition techniques to control the emissions of asbestos containing insulation materials located within the buildings. Fifteen hundred tons of steel were recovered for recycling; approximately 3500 tons of material was disposed of as friable asbestos containing material. All work was completed in accordance with regulatory guidelines with no incidents/injuries.